Bhandari House: Nehru Place, New Delhi
10 storied RCC framed structure, 7500 Sqm built-up area
1955-59
Supreme Court of India, New Delhi
Prestigious building with majestic domes at 100 feet height
1966-67
Philippines Embassy New Delhi
1966-68
12. US Aid Administrative Building & Warehouse, New Delhi during 1966-68. A complete RCC structure with folded plate construction built for the U.S.A. Government in a record period of 20 months including sanitary, electrical, etc. complete total area constructed 18600 Sq.m.
1972-74
Sagar Commercial Complex at 6 Tilak Marg, New Delhi, during 1972-74.
1972-74
High Court Building, New Delhi during 1972-74. A RCC framed construction with basement
laid on RCC mezzanine raft with total built up area of 23500 Sq.m. built to the design and
specifications of C.P.W.D.
1972-74
Egyptian Embassy, New Delhi during 1972-74
1971-74
USIS Library Building at Curzon Road, New Delhi during 1971-74. A six storied RCC framed
structure having area of 17000 Sq.m. with one basement built on driven RCC piles, complete
civil, electrical sanitary, mechanical air conditioning and water treatment plant. It has
a small auditorium, cafeteria and reading area, built to International specification and
architect.
1971-74
USIS Residential House, at Bhagwan Das Road New Delhi, during 1971-74
1971-74
US Aid Residential Complex at Mehruli, New Delhi, to house all American Employees of US
AID in India. The Building was constructed with concrete bricks and with super fine finishes
with all facilities like swimming pool, bowling alley etc.
1972-73
The Malaysian High Commission Building, New Delhi during 1972-73. Total Area of construction 18600 Sq.m.
1970-71
Vandana" Multi-storeyed Office Complex, New Delhi during 1970-71 for GEE VEE Enterprises,
11, Tolstoy Marg, New Delhi. A 14 storied RCC framed structure commercial building with an
area of 17000 Sqm. built on driven piles 20 mtrs deep with basement area of 2000 Sqm car
parking and other facilities
1970-71
Bank of Baroda, New Delhi. The first Skyscraper to be constructed in New Delhi.
Udyog Bhawan, New Delhi. A RCC framed structure with an office area of 30600 Sq.m. built to the order of C.P.W.D. The building is finished with red stone upto Entrance Floor.
Central Board of Revenue Building, New Delhi. A Four storied building with central pillar
going upto 5t" floor and the first multi storied building in post independence period. The
built up area is 18600 Sq.m. and was completed in 20 months.
Construction of 10 storied Commercial complex at Vaishali in Gaziabiad District (UP)
17. International Arrival Hall including Custom Block at Palam Airport, New Delhi. A fully air-conditioned building built in a record period of six months including Custom Block, Canteen.
1960-65
Hotel Oberoi, New Delhi
500 beds, nine public places, international standards swimming pool
2004
Interior Finishes for 5 Star Hotel Ashoka, Bangalore
Completed in April 2004
Bhilai Hotel, Bhilai. 250 Rooms Hotel for Bhilai Steelworks, Total area of construction: 14000 Sq.m.
Qutab Hotel New Delhi
2005
526 SFS Houses for Delhi Development Authority
Includes all electrical, plumbing, and external development works
2006
Skylark Greens Villas at Whitefield, Bangalore
Completed in October 2006
2008
Construction of Residential Buildings (G+3floors) consisting of 75 Flats at Jagdish Nagar in Bangalore, completed in Feb 2008
Residential Buildings "Diamond District" at Airport Road in Bangalore (Basement + 7 floors)
Construction of 800 houses along with Schools, Commercial Complex, Shopping Centres, Day
Care Centres all constitutes a neighbourhood along with complete Electrification, Water
supply, Sewerage disposal, Internal & External Roads on turnkey basis. 800 Units, 102000 Sqm.
Low and Middle Income Residential Colony. 320 Units, 17000 Sqm. with pre-cast slab & 4
Storied load Bearing Buck structure.
Middle Income Residential Colony at Mehruli, New Delhi.156 Units, 16000 Sqm.
Residential Quarters. 40 units, 3000 Sqm.
Sagar Residential Apartments, New Delhi. Fourteen storied High residential apartments with a built up area of 22800 Sq.m. with basement car parking, swimming pool etc. The Structure is RCC cast-in-situ.
Residential Colony with club. 40 Units, 3000 Sqm.
Residential Colony construction in the prestigious area of the capital for senior Officers of Central Government of India. 800 Units, 10800 Sqm.
Residential Colony for Ordinance Factory.9500 Sqm.
Residential Colony for Ordinance Factory. 306 Units, 20500 Sqm.
Low cost Housing for Central Govt. Employees. (Area 40000 Sqm.)
a) C.D. & E Type officer Quarter. 160 Units, 24000 Sqm.
b) Training School, Hostel & Other allied construction to accommodate 300 Students, Area - 13000 Sqm.
Reconstruction of Ramgarh Camp, for the army to house army officer & jawans of all ranks
100 Barracks, 37000 Sqm.
Residential Accommodation for Infantry Brigade Centre and Mess. 80 Barracks, 14000 Sqm.
Double storied Residential Accommodation for Senior Officers including Mess Swimming Pool, Canteen and Club.
Prisoners of war Camp, Temporary Barracks for 10,000 Persons including Roads, Developments,
Chehal done during World War II. 300 Barracks, 33500 Sqm.
Construction on Division Army Camp done during World War II. 19000 Sqm. (Approx)
Repair and maintenance and term contract for Ordinance Factory - Annual Repair.
Technical Accommodation for Armed Brigade, complete work including Hangers Storage Sheds of Administrative offices, Hard standing for Tanks and others done during World War II.
1988-90
Construction of Ancillary Building at Rail Coach Factory Kapurthala, Punjab during 1988-90.
1992-93
Construction of paint shop and godowns at Rail Coach Factory, Kapurthala, Punjab during 1992-93.
1994-95
Civil and Structural Work for the construction of Tarpaulin Plant Factory for Dempo Group of
Goa. Total Covered Area Taloja, New Mumbai of 16000 M2 in MIDC, during 1994-95.
Chemical reprocessing factory with very heavy machine & vessel foundations and the like with
special flooring of Epoxy Resins/ Acid Proof covering for heavy duty industrial floor for
Platinum & manufacturing of other components with precious metal.
Furnace shop building and effluent treatment tanks for treating chemical wastes along with
Underground and Overhead water storage reservoirs.
"Production shop Building" (in structural steel) and "Allied works" for the Ordinance factory, Jabalpur.
"Factory of Good Year Tyre & Rubber Co, India Ltd", Ballabgarh. Main Plant with basement
Boiler House, Storage area and with administrative office, Ware House and canteen, all
complete.
Construction of "Pankota Bund" and "Lal Ghat Bund" at Varanasi for Govt. UP
Construction of Ordinance Factory / Machine Tool Factory along with Training School, Workshop and Research Centre at Ambernath
"Foundation and Development of Attock Oil Company" Rawalpindi
RCC concrete Reservoir 6 Nos. at Tarki near Dist. Jhelum.
Construction of "Road at Chowk No. 6" Rawalpindi
1981-87
Design & Construction of Township, Turnkey Project at Al Najaf and High Rise apartments at
Basra for Govt. of Iraq with British Standard Specification during 1981-87.
1988
Design & Construction of Township at LA-Vigie, Mauritius in 1988, Execution was abandon by the Employer.
Involved in major Sewer Network Projects in Kingdom of Saudi Arabia.
Construction of 800 houses along with Schools, Commercial Complex, Shopping Centres, Day
Care Centres all constitutes a neighbourhood along with complete Electrification, Water
supply, Sewerage disposal, Internal & External Roads on turnkey basis. 800 Unit, 102,000 Sqm.
Laid complete asphalt road after consolidating sandy soil in the Desert of Iraq for the
complete township at Najaf for and on behalf of the Govt. of Iraq. Total length of road
constructed was 20Kms.
Sewage Treatment Plant for the city of Al-Najaf in Iraq for The Ministry of Housing, Govt. of Iraq.
Sewage Treatment Plant & laying of Sewer Net Work for Kathmandu, Nepal (World Bank Aided Project)
In joint venture with IMPREST (a wholly owned subsidiary of FIAT Group, Italy) involved in Sewerage System including Treatment Plant for the city of Riyadh, Saudi Arabia Italian Designed & executed as per British/German Specification
1950-52
Shell Refinery, Bombay
Part of refinery construction
Attock Oil Refinery at Rawalpindi now in Pakistan.
Stanvac Refinery at Chembur, Bombay
2x130 MW Thermal Power plant for Jindal Tractebel Power Co. Ltd. at Toranagallu (Karnataka)
2x500 MW Super Thermal Power Plant at Talcher for National Thermal Power Corporation Ltd.
Extension of 2x60 MW Thermal Power Plant for SAIL at Bhilai and Bokaro Steel Plants.
2x200 MW Sarani Thermal Power Plant at Sarani (MP) for Madhya Pradesh Electricity Board.
Major and minor structures of "Strengthening and Up gradation of existing 4 lane to 6
lane from Km 44/300 to Km 66/00 of NH-1 in the state of Haryana".
Major and minor structures of "Strengthening and Up gradation of existing 4 lane to 6 lane
from Km 16/00 to Km Delhi 29/00 of NH-1 in the state of Delhi"
River Bridge of 108 m length, two carriage ways each of 15m wide and other major
structures in Kon Kalamboli Section of Mumbai - Pune Expressway
Construction of Road Bridge in New Delhi with Four Lane Track, built with Pre-stressed
Girder and well foundation going up -to 80 feet below the water level on the River
Yamuna. The pre-cast pre-stressed Girder each weighing 180 Tons were launched with the
help of launching Girder fabricated by us along with Launching trolleys & winches.
Construction of Railway Bridge across Yamuna River with well foundation at 90 feet below
the riverbed & with steel girder.
Jindal Vijayanagar Steel Plant
Civil works of Basic Oxygen Furnace &other Works at Toranagallu, Bellary, and Karnataka.
Durgapur Steel Plant
Civil Engg. Works for the Construction of Wagon Tippler, Track, Hopper, Junctions House,
Galleries Tunnel, Sinter Mix bed etc. in Material handling Complex for modernisation of
Durgapur Steel Plant at Durgapur (W.B.) during 1990-93
Bokaro Steel Plant
1. Civil Engineering Works: Thermal Power Turbo Blower Station. Zone II at Bokaro Steel
Plant for Hindustan Steel works construction Ltd.
2. 3 Million Ton Cold Rolling Mill for Bokaro Steel Stage I including one single RCC Pour of 10,000 M3 of concrete, during 1968-73.
3. Part of Hot Rolling Mill (Part) for RCC Large Foundation during 1968-73
4. Wagon Tippler, Coke oven, Track Hopper, Junction House, Galleries, Tunnels etc. during 1974-79 expansion.
5. Civil Engineering works for "Steel Melting shops" with 500 Ton converter at Bokaro Steel
Plant for Messrs. Hindustan Steel Works Construction Ltd. during 1974-79.
Bokaro Steel Plant
1. Civil Engineering works in Group - I and II of Raw Materials Handling Shop Zone in
Visakhapatnam Steel Plant.
Rourkela Steel Plant
1. Large RCC Foundation & Super Structure works for
a)Blast Furnace, Steel Melting Shop during 1957-61
b)All Civil and Allied works required for the expansion (Stage II) for the Sintering Plant for the Steel Mill during 1963-67
2. Civil works in the Plate Mill and water treatment Plant area for the modernisation of Rourkela Steel Plant.
3. Civil works for the Mills & Treatment areas of Rourkela Steel Plant, Re¬heating furnace Project & Pump House.
Bhilai Steel Plant Bhilai (MP/Chattisgarh)
1. "Large RCC Foundations works" for the Bhilai Steel Plant consisting of units such as Foundry, Electric Repair Shop, Oxygen Plant, Gas holder, Railway work shop, Wagon Repair Shop, Fuel storage, RCC Reservoir, Motor Repair shop, underground drainage system such as Storm water, Sewerage, Electric cable, Trenches, Tunnels etc. for 1 Million Ton Plant - 1957 to 1960.
2. For Expansion from 1 Million to 2.5 Million Ton Stage Construction of RCC Foundation for Open Hearth and Coke Oven Batteries along with 100 meter high R.C.C. Chimney, during 1962-65
3. 400 Beds Hospital Complex with allied Building
Construction of 10km long Pre-Stressed Concrete Circular Conduit 3250mm dia from Muradnagar to Hindon River (0-12.5Km) – 270 Cusec Raw Water
pipeline Project at Muradnagar, Ghaziabad (UP) for Delhi Jai Board. The work involves excavation of 7 lac cum 4 to 8m deep and 39000 cum of concreting work.
Construction of 6.2 Km long D-shaped tunnels with a cross-selection of 32sq.mtrs. 180feet
below ground for irrigation purposes for takeoff from konar reservoir in Hazaribag
district, Bihar during 1981-89. The work involves excavation in rock of 2.5 lac cum at
90- 110 feet below ground level.
Sewage treatment Plant & laying of Sewer Net Work for Kathmandu, Nepal
(World Bank Aided Project). The work was executed during 1977- 1981.
Sewage treatment Plant for the city of Al-Najaf in Iraq of the Ministry of Housing, Govt. of Iraq. The work was executed during 1980-85.
Designed and Executed by BBL as per British Standard
The Biggest Hopper Based Settling Tank (Clarifiers) to treat 100 Million Gallon of
water every day along with Pumping Station and Pipeline for treated water for Bombay
Muncipal Corporation (A World Bank Aided Project) during 1976-79.
RCC Circular 10MLD Demineralisation Plant alongside with Filter and Built in Aerator
for 2 X 500MW Power Plant in Talcher, Orissa.
2 Million Cement Plant at SATNA (MP) during 1995 -97 for PRISM CEMENT LTD.
Construction of Indoor Stadium with a seating capacity of 2000 persons at Koramangala,
Bangalore for Sports Authority. This stadium was especially built to hold National Games.
We designed and put up the largest Space Frame Roof (160 M x 60 M) built in India, in its